Production Slip Delay Registry entry
Specifies a period of time (prior to the current date). If a certificate is ordered for an event that occurred during the specified period of time, a production slip is not required.
Note: Only for use by the Queensland Registry of Births, Deaths and Marriages.
A production slip is required when a certificate is ordered for an event that occurred more than a specified period of time from the current date.
This entry specifies the period of time within which a production slip is not required. If the event occurred before this period of time, a production slip will be required.
Usage
This Registry entry is assigned to groups:
Key | Group |
---|---|
Key 1 | Group |
Key 2 | Default |
Key 3 | Table |
Key 4 | epos |
Key 5 | Production Slip Delay |
Key 6 | module |
Value | delay |
Group | Default | Table | epos | Production Slip Delay | module | delay |
where:
module | the registration table holding details of the event. This entry may be different for different modules, e.g. it may be 60 days for Births and 120 days for Deaths. |
delay | is the number of days an event occurred prior to the current date. If the event occurred within the number of days specified by delay, a production slip does not need to be printed. For example, if delay = |
Example
This entry specifies a delay period for Births to be 60 days. If a birth occurred within 60 days of the current date, a production slip does not need to be printed:
Key | Setting |
---|---|
Key 1 | Group |
Key 2 | Default |
Key 3 | Table |
Key 4 | epos |
Key 5 | Production Slip Delay |
Key 6 | ebirths |
Value | 60 |